8500397
Indefinite Delivery Of Retro‐CX and Infrastructure Condition Assessments
DFW Airport
Program Description: MPO Solutions is the Prime JV partner for MPO Matador JV LLC. The JV is currently performing services under 8500397 Indefinite Delivery of Retro‐CX and Infrastructure Condition Assessments though for DFW Energy Transportation and Asset Management Department (ETAM). The firm is currently providing retro-commissioning and infrastructure asset condition assessments on various facilities to modernize the airport’s asset portfolio over a five-year period.
MPO Matador JV provides overall program oversight and management of various facilities and civil related assessments. Services have been conducted on a task/delivery order IDIQ basis to include multi-discipline facility and infrastructure condition assessments, cost estimation, and projected life cycle costs for various airport installations.
Projects are scheduled on a multi-phased approach and assessment teams are assigned to collect field information in preparation of reports that would include short- and long-term recommendations along with probable opinions of cost. Notable Civil and Infrastructure completed projects under this contract include:
• DO 01 - Trigg Lake Dam Assessment Annual Inspections 2022-2027
• DO 05 - Terminal D Building Automation and Mech System
• DO 06 - Trigg Lake Dam Breach Analysis
• DO 09 - Engineering Assessment of the Indoor Firing Range
• DO 10 - N&S Toll Plaza Tunnel Assessment
• DO 13 - Energy Plaza 420V Switchgear Assessment
• DO 14 - Data Center HVAC and BAS (DC1 and DC2)
• DO 20 - CTA Irrigation System
• DO 21 - Terminal D ITS Room HVAC & BAS
• DO 26 - Terminal Circular Road PCI
• DO 28 - Data Center 1 and 2 Emergency Electrical Equipment
• DO 34 - Lead and Copper EPA Water Main Evaluation
• DO-37 - Water & Wastewater Software Models Update